Building the Future, Restoring the Past
Both buildings to get improvements during summer construction work
Work has begun on the $5 million work of projects that remain as part of the January 2016 capital project.
As part of Mayfield’s $15.5 million 2016 capital improvement project, the remaining items are to be completed this summer. About $10.5 million worth of work from the project has already been accomplished. Here is the list for this summer:
At the Jr./Sr. High School: renovations to the art, Family and Consumer Sciences, Project Lead the Way and Distance Learning classrooms, as well as the weight room; upgrades to the auditorium, including new lighting, stage, video capabilities and energy-efficient fixtures; creation of a secure vestibule and relocation of the main office, guidance and library; addition of a secure vestibule for entering the District Office; installation of a pass-key system/fob access to two entry doors; upgrade of the security, fire and emergency alarms and public address system; field improvements including drainage, playing surfaces, fencing, backstops and scoreboards; and enhanced handicapped accessible parking.
At the Elementary School: upgrades to the main office with creation of a secure vestibule; additional security features including a pass-key system; upgrade of the public address and notification systems; replacement of the original building doors and hardware; upgrade of the corridor floor; renovation of the north and south wing boys and girls bathrooms and small classroom bathrooms; and replacement of roll-up shades.
Here are photos of the construction in the former Jr./Sr. High School library and on the baseball field. Additional photos will be added each week during the summer:
9/5/18 – A look at the finishing touches by the first day of school. These pictures include the revamped, secure jr./sr. high school entrance as well as home and careers, art and stem classroom upgrades and the updated secure elementary entrance.
8/16/18 – Here are photos from the capital project work that include the high school home and careers classroom, steam room and library, the new floor at the elementary school and installation of the sound system on the baseball/soccer field.
8/6/18 – Here is capital project work on the baseball, softball and soccer fields as well as the elementary school.
7/27/18 – Here is capital project work at the elementary school bathrooms and gymnasium, high school library and softball field.
7/19/18 – Here are photos of work at the elementary school, district office and softball field
6/29/18 – Here are photos of work in the high school classrooms and on baseball diamond, including a video of top soil being applied to the diamond.
Here’s a video of top soil being placed on the softball field (YouTube).
June 22, 2018 – Here are some photos of the current library, which will become the Jr./Sr. High School main office: